The Michael Tippet School
CLIENT: London Borough of Brixton
TOTAL PROJECT VALUE: £8m (FF&E element £.9m)
PROJECT DESCRIPTION:
Pupil referral unit in Brixton for 11-18 year olds. Most students were virtually homeless or ‘sofa surfing’. Behavioural issues masked a complex needs requirement of disability, complex learning needs and pastoral support. The school encouraged a cooperative design process, ie we brought ideas as did they covering a number of key areas.
THE RAD SCOPE & BRIEF:
To deliver a school that manages severe behavioural issues and yet still offer the widest possible curriculum safely. We delivered the designs, the procurement and fit out.
OUR SOLUTION:
We created an award winning solution with a product selection that allowed for robustness but still offered a soft and inclusive aesthetic.
HOW WE MADE A DIFFERENCE:
- Helped develop the technology curriculum potential beyond the school’s
expectations, creating a centre of excellence for behavioural needs. - Brought our knowledge of equipment, safe working zones and supply chain
expertise to create the maximum space utilisation with the best solution for the budget. - Delivered workable ideas on space zoning that enabled the school to exceed all expectations.
- Created a safe environment for both students and staff
- Considered how to deal with a range of behavioural symptoms including the need for life skills, being able to socialise in a normal family environment, eating at a table, daily food needs, pastoral support
- Detailed the start and end of day sequence avoiding bottlenecks to get students to where they needed to be quickly
- Considered out of hours needs and support for students in difficult or non existent family environments
- Detailed a parenting suite where parents / guardians could be supported in how they interact with their wards.
